Drawer via Free Construction
Access
imos Manager > Tab Details > Methods window > Free Construction > Drawers
iXplorer > Select an respective element in the Elements window > Properties > Methods > Free construction
General Information
Now it is possible to insert a drawer in the drawing via the free construction without specially having to create an article for this.
Procedure
For placing the drawer, a bounding box is created by dragging a Drafting Box which displays the drawer zone so that the size and position of the (inner) box are defined. That defines the size and position of the (inner) box.
Afterwards further settings can be set in the Manager.
Depending on the default in the properties dialog, the connection scan dialog could appear and a connector set has to be selected.
A collision check does not take place!
imos determines all surrounding parts around the box frame.
Firstly, in the found parts the machinings are generated (drillings of the slide in the side, etc…). and secondly, with the surrounding parts the fronts including gaps are calculated.
Depending on the settings in the view data and the type of the found part (top shelf, construction shelf, bottom shelf etc.), is the result for the gaps and fronts.
Options
| Principle | A drawer princitple can be selected. |
| Enter number of drawers: |
Defines the number of boxes which are inserted in the bounding box. Therefore the default box dimension from the drawer principle has to be considered. If the instructions conflicts, a corresponding error message will appear. |
| Construction |
You can choose between an inset and onset construction. For an onset construction the filler will be inserted in front of the bounding box. |
| Recess |
Defines the inset for the front.
|
| Gaps |
Defines the gaps of the front to the surrounding parts. The values from the Design parameters of the order are used as default. |