Tab Contents/ Order items

Access

Organizer > Order Manager > Menu > Tab Contents

General Information

All positions of the selected order are listed in a grid in the tab Contents.

The tab Order items can be accessed either by making a double-click on the order name in the grid of the tab Contents or by selecting the order name in the grid and clicking the button Show content in the top menu.

Here , you can find the documentation for the Calculation.

Structure

Picture

Shows a preview for the position.

If a picture has not been defined for the position, then this can be subsequently allocated via the function select picture.

Position hierarchy

An icon is displayed to show if the element is an article, a position, a discount or a text.

The field also shows the hierarchy level of the element.

The field is equivalent to the hierarchy in the imos Manager.

The information for the position influence the definition of hierarchy .

Position Defines the position of the element in the hierarchy.
Name

Name of the element.

Freely editable for positions, discounts and texts.

Kurzbeschreibung Editable text field.
Quantity

The specified quantity can be edited here.

However, the quantity change has only an effect on the calculation of the order and not on the quantity in the bill of materials.

Costs*

The costs are only calculated if the calculation is activated!

They depend on which type of calculation has been applied. The calculation type can be defined via the calculation principle.

It should be noted that for the calculation only articles will be considered. Elements that have been inserted via the Free Construction , and have not been summarized subsequently in article, are not calculated.

Overhead calculation:

The costs consists of the components:

Material cost + Material overhead cost

+

(( Manufacturing cost + Manufacturing overhead cost ) + external Manufacturing Overhead Cost [%] )

Material overhead calculation:

Direct material cost x (Material overhead factor/ 100)

Article calculation:

Price from the catalog price field of the Article Designer.

Original SP*

The OrgSP is only calculated if the calculation is activated!

The value depends on the used kind of calculation. The calculation type can be defined via the calculation principle.

Overhead calculation:

( Production cost + surcharge [%] ) - Trade discount (on Production cost)

Production cost: Manufacturing cost + Material cost
Surcharge (profit, commission, administration/ distribution overhead, special distribution cost):

Production cost x

Surcharge[%]

Trade discount: (Production cost + Surcharge) x Trade discount [%]
Discount in %

Discount in percent

Can be individually adjusted.

Gross discount

Gross discount

OrgSP/100 x discount in %

SC Piece

Sales cost per item

OrgSP – discount

or

The value depends on which type of calculation has been applied. Click with the mouse in the field and enter the desired value for a manual definition.

Total SP

Sales cost total:

Quantity x SC piece

VAT in %

Value added tax in percent:

Can be defined by the customer or individually adjusted by changing the value in the grid.

Gross VAT

Gross Sales tax

SC piece/100 x VAT in %

Margin*

Profit margin:

(SC piece – costs) / costs

The margin can only be calculated if the calculation is activated!

Gross Price

Sales costs Gross:

total SP + gross VAT

*) This function is optional and is not included in the basic version of Organizer .