Tab Contents/ Order items
Access
Organizer > Order Manager > Menu > Tab Contents
General Information
All positions of the selected order are listed in a grid in the tab Contents.
The tab Order items can be accessed either by making a double-click on the order name in the grid of the tab Contents or by selecting the order name in the grid and clicking the button Show content in the top menu.
Here , you can find the documentation for the Calculation.
Structure
| Picture |
Shows a preview for the position. If a picture has not been defined for the position, then this can be subsequently allocated via the function select picture. |
||||||
| Position hierarchy |
An icon is displayed to show if the element is an article, a position, a discount or a text. The field also shows the hierarchy level of the element. The field is equivalent to the hierarchy in the imos Manager. The information for the position influence the definition of hierarchy . |
||||||
| Position | Defines the position of the element in the hierarchy. | ||||||
| Name |
Name of the element. Freely editable for positions, discounts and texts. |
||||||
| Kurzbeschreibung | Editable text field. | ||||||
| Quantity |
The specified quantity can be edited here. However, the quantity change has only an effect on the calculation of the order and not on the quantity in the bill of materials. |
||||||
| Costs* |
The costs are only calculated if the calculation is activated! They depend on which type of calculation has been applied. The calculation type can be defined via the calculation principle.
It should be noted that for the calculation only articles will be considered. Elements that have been inserted via the Free Construction , and have not been summarized subsequently in article, are not calculated. Overhead calculation: The costs consists of the components: Material cost + Material overhead cost + (( Manufacturing cost + Manufacturing overhead cost ) + external Manufacturing Overhead Cost [%] ) Material overhead calculation: Direct material cost x (Material overhead factor/ 100) Article calculation: Price from the catalog price field of the Article Designer. |
||||||
| Original SP* |
The OrgSP is only calculated if the calculation is activated! The value depends on the used kind of calculation. The calculation type can be defined via the calculation principle. Overhead calculation: ( Production cost + surcharge [%] ) - Trade discount (on Production cost)
|
||||||
| Discount in % |
Discount in percent Can be individually adjusted. |
||||||
| Gross discount |
Gross discount OrgSP/100 x discount in % |
||||||
| SC Piece |
Sales cost per item OrgSP – discount or The value depends on which type of calculation has been applied. Click with the mouse in the field and enter the desired value for a manual definition. |
||||||
| Total SP |
Sales cost total: Quantity x SC piece |
||||||
| VAT in % |
Value added tax in percent: Can be defined by the customer or individually adjusted by changing the value in the grid. |
||||||
| Gross VAT |
Gross Sales tax SC piece/100 x VAT in % |
||||||
| Margin* |
Profit margin: (SC piece – costs) / costs
The margin can only be calculated if the calculation is activated! |
||||||
| Gross Price |
Sales costs Gross: total SP + gross VAT |
*) This function is optional and is not included in the basic version of Organizer .