Tab Content

Access

Organizer > Order Manager > Grid > Content

General Information

On the tab Content the information for the current project or order are shown.

Structure

Quantity

The quantity is defined with 1 by default, but can be still manually modified.

For modifying the quantity, click in the grid and enter the desired quantity in the blue field. At the same time the overall costs change as well.

Price

The costs for an order.

The value derives from the column Gross SP in the tab positions .

Total Price The overall costs differ from the costs if the quantity is unequal 1.