The quantity survey added the raw material costs (Direct material costs) and direct manufacturing cost together to one price. The type of calculation is independent from the calculation principle.

The calculation is displayed in a report.

This report is divided into 2 sections:

  • Material usage
  • Expenditure of time

The pure material costs and the expenditure of time are added together to one price.

The material usage consists of the following components:

  • Material (price/m² x area)
  • Surfaces (price/m² x area)
  • Profiles (price/m x length)
  • Connector(price/piece x quantity)
  • SPP (price/m x length)
  • Colour principle (price/m² x area)

The expenditure of time is based on the costs from the cost centers and the times for the production steps.